Puddled land preparation through transplanting and post-harvest drying.
- 120 – 150 days
- Terai · Hills · Inner Terai
- 6 stages
Puddled land preparation through transplanting and post-harvest drying.
Seedbed preparation, sowing rate, split urea and irrigation cues.
OPV and hybrid systems: line sowing, basal NPK, two top-dressings.
Nursery raising through curd harvest, with per-variety fertilizer splits.
Nursery, staking, top-dressing and harvest at breaker stage.
Nursery raising through harvest at neck-fall.
Try clearing the search box or resetting the filters.